HTS Code 8504.90.96.38 — U.S. Import Duty & Tariff Rate (2026)
Official Description: Stacked cores for incorporation into transformers
U.S. Import Duty & Landed Cost Calculator — HTS 8504.90.96.38
Estimate total customs duties, Merchandise Processing Fee (MPF 0.3464%), Harbor Maintenance Fee (HMF 0.125%), and landed cost.
Calculate HTS 8504.90.96.38 Duty by Country of Origin
Full HTS Classification Hierarchy
- Electrical transformers, static converters (for example, rectifiers) and inductors; parts thereof:
- Parts:
- Other:
- Other
- Other parts:
- Of transformers:
- Stacked cores for incorporation into transformers
Frequently Asked Questions — HTS 8504.90.96.38
What is the 2026 U.S. import duty rate for HTS 8504.90.96.38?
Under USITC Revision 23 (2026) (11/10/2026), the Column 1 General (MFN) duty rate for HTS 8504.90.96.38 (Stacked cores for incorporation into transformers) is Free. Goods from Column 2 countries (Belarus, Cuba, North Korea, Russia) are assessed at 35%.
Is HTS 8504.90.96.38 duty-free under USMCA (Mexico & Canada)?
HTS 8504.90.96.38 does not explicitly list a separate USMCA 'S' preferential override at this line; check parent subheadings or verify whether the General MFN rate (Free) is already Free.
Do MPF and HMF customs fees apply to HTS 8504.90.96.38?
For formal commercial entries over $2,500, U.S. CBP assesses a Merchandise Processing Fee (MPF) of 0.3464% (minimum $32.71, maximum $634.62) unless exempt under a qualifying Free Trade Agreement. Ocean freight shipments also incur a 0.125% Harbor Maintenance Fee (HMF).
Could additional Section 301 or Chapter 99 tariffs apply to HTS 8504.90.96.38?
Always verify country-specific Chapter 99 trade remedies (such as Section 301 for China or Section 232 for steel/aluminum) with your customs broker prior to entry.
Related HTS Codes in Heading 8504
| HTS Code | Description | General (MFN) |
|---|---|---|
| 8504 | Electrical transformers, static converters (for example, rectifiers) and inductors; parts thereof: | — |
| 8504.10.00.00 | Ballasts for discharge lamps or tubes | 3% |
| 8504.21.00 | Having a power handling capacity not exceeding 650 kVA | Free |
| 8504.21.00.20 | Having a power handling capacity not exceeding 50 kVA | Free |
| 8504.21.00.40 | Having a power handling capacity exceeding 50 kVA but not exceeding 100 kVA | Free |
| 8504.21.00.60 | Having a power handling capacity exceeding 100 kVA but not exceeding 500 kVA | Free |
| 8504.21.00.80 | Having a power handling capacity exceeding 500 kVA but not exceeding 650 kVA | Free |
| 8504.22.00 | Having a power handling capacity exceeding 650 kVA but not exceeding 10,000 kVA | Free |
| 8504.22.00.40 | Having a power handling capacity exceeding 650 kVA but not exceeding 2,500 kVA | Free |
| 8504.22.00.80 | Having a power handling capacity exceeding 2,500 kVA but not exceeding 10,000 kVA | Free |
| 8504.23.00 | Having a power handling capacity exceeding 10,000 kVA | 1.6% |
| 8504.23.00.41 | Having a power handling capacity exceeding 10,000 kVA but not exceeding 59,999 kVA | 1.6% |
| 8504.23.00.45 | Having a power handling capacity exceeding 59,999 kVA but not exceeding 100,000 kVA | 1.6% |
| 8504.23.00.80 | Having a power handling capacity exceeding 100,000 kVA | 1.6% |
| 8504.31 | Having a power handling capacity not exceeding 1 kVA: | — |
| 8504.31.20.00 | Unrated | Free |
| 8504.31.40 | Having a power handling capacity less than 1 kVA | 6.6% |
| 8504.31.40.35 | Having a power handling capacity less than 40 VA | 6.6% |
| 8504.31.40.65 | Having a power handling capacity 40 VA or greater | 6.6% |
| 8504.31.60.00 | Having a power handling capacity of 1 kVA | 1.6% |